The engine is ready for top secret intake to be set-up.
The diff center has been rebuilt with a 31 spline true-track center and 3.5:1 9" ring and pinion.
The rack and pinion steering housing and shaft shortened to suit the 53 front suspension geometry.
Reassembled ready to be fitted.
The sheet metal housing and stainless 4-bars being fitted up for the first time
Now the hard work really begins. The packaging of the panhard bar, coil-over's and mounts, fuel tank, tucking the big tyres and routing the exhaust all in the limited area.
The wheel being checked for clearance at bump height.
[ Back ] [ Racecraft home ] [ Next ]